Designed well. Can it be built for the price?
Designers are rarely in the room when a contractor prices the work. We have been, for our whole careers. We read your design the way an estimator and site team will, before anyone prices it.
The contractor's view
What a contractor sees in your design
A design can be right and still be hard to build. Every awkward sequence, missing temporary works detail or unclear interface is cost, and a bidder will price it or wait for the change.
- Sequencing and accessWork that cannot be built in the order drawn, or without access nobody has allowed for.
- Temporary works and interfacesPropping, diversions, outages and handovers the design assumes but never shows.
- Cost the design does not needDetails, tolerances and materials that add cost without adding value, with options for your team.
Buildability and Deliverability Review
Can this design be built efficiently as drawn?
- Construction sequence, access and working space
- Interfaces between disciplines and with live assets
- Temporary works and outage or possession dependencies
- Design elements that are expensive to build for their function
- Site and ground information a bidder will rely on
A rated design, the issues that will become change, and options for your designers.
Our findings are advisory. Design responsibility stays with you, and we never redesign.
Two ways to work with us
Your choice, project by project.
CALON as named independent reviewer
Your client sees an independent buildability review from a separate firm. Useful where boards, funders or audit want assurance from outside the design team.
Findings delivered to you, disclosed to your client
We work as your construction check. You receive the findings and options and present them your way, telling your client an external reviewer was used.
Fees
Fixed, by project value, agreed in writing before work starts. Regular work? Ask about a pipeline rate card, with rates for committed volume on request.
| Review | Under £2m | £2m to £15m | Over £15m |
|---|---|---|---|
| Buildability and Deliverability Review | £4,000 to £6,000 | £6,500 to £9,500 | £10,000 to £15,000 |
Fees exclude VAT, which is added where it applies. Typical turnaround 5 to 30 working days, by project size. Free close-out check of your changes.
We act only for the client's team
We review for design consultants appointed by the client. We do not review for a designer working for a bidder or contractor on that scheme, and we take one role per scheme.
- Conflict check before every engagement: who appoints you on this scheme?
- Mutual NDA and individual confidentiality undertakings
- Your client relationship stays yours
- We never approach your client directly about work you bring us